Load the day's folder
Nothing is uploaded — files are read inside this tab only. Choose individual files instead
Reference files
used whenever the date folder does not carry its own copyBread order
Type what bread is lying in the factory. The whole holding goes out on tomorrow's dispatch, split across every outlet in proportion to its ideal, so the factory finishes at zero and tomorrow starts fresh.
Stationary & Small ware
Asked for, not topped up — there is no ideal or on-hand for these. Click a list, type the quantity against the outlet, and it goes out on the Dry Store / PM / HK challan and voucher. Challan only: nothing here is written into the PACT import file.
Dispatch day
Outlet dispatch schedule
Additional items & overrides
optionalPick the outlet, type the item. Each outlet gets its own voucher and its own tab on the Additional challan.
Paste as text instead
One per line: Outlet | Category | Product | UOM | Qty
Anything typed here is added to the rows above.
Skip for an outlet: Outlet | text to match
Force a quantity: Outlet | Exact Product Name | Qty
Lock a product pairing permanently:
Ideal Inventory name | name as written in outlet sheet
Several outlet rows for one product — separate with ; (on-hand added up).
Use SKIP to tell the app never to match a product.
Anything the app is unsure about is listed under Names needing your confirmation after you run it — copy the suggested lines here once and it will never ask again.
Run
Files download to your Downloads folder — move them into Final Outlet Order Sheet.